40,000 Sq. Ft. Produce Storage and Distribution Facility

Perley-Halladay worked in conjunction with the Keany Produce’s architect and construction team to build this new distribution facility. Our scope of work included architectural and mechanical design, construction of the insulated enclosures and installation of the refrigeration systems.

Highlights

  • Multiple Refrigerated Rooms including 34°F, 45°F, 40°F Dock and Repack Area
  • Split-System Refrigeration Design with CPC Control System